BSPR Engineering staff will be conducting planned maintenance and upgrades on the KBSX 91.5 transmission facilities this afternoon, between 1 and 3 p.m.
This work will require the transmitter and antenna system for 91.5 to be de-energized for a time, with an off-air duration of approximately 15 minutes or less during this maintenance window.